Saturday, February 03, 2007

Finished Miata


The Miata socks are done. Actually they've been done for a while but I just now got around to posting. I have given them to their owner and she was very pleased with them. I was worried about the fit since she wasn't around for the final length fitting. But, she said they fit perfect. I was very happy with the way the colors worked out with this yarn. There is no annoying flashing, spiraling or pooling. Specs for this project can be found here.
Believe it or not I do not have another sock project started. I need to dye up some yarn before I can start another pair. To keep my fingers busy until I can get time to dye I have started a scarf. I'm using the Harlot's One Row pattern with Cascade 220. The color is 9438, Tahiti. This yarn has been languishing in the stash for a while waiting for the right project to come along. I tried Grumperina's Shifting Sands scarf, a simple moss stitch scarf, and a couple more that I can't remember right now. But none of those were right for this yarn. Finally I remembered the one row scarf and decided to give it a try. It was perfect. This may be my new favorite scarf pattern. It's easy enough to be a take along project. It's simple but not at all boring. It's reversible and looks stunning. I cast on 30 stitches on size 8 needles and will knit until I run out of yarn. By my calculations this should result in a scarf about 45" long. This would be a perfect time to show you a picture of the scarf in progress but I forgot and left the camera in the truck overnight and the battery is dead. As soon as it finishes charging I'll get a picture.
Yarn for a sweater has been ordered but unfortunately the post office is in no rush to get it to me. It languished in the Atlanta Sortation center for a day and a half. Come on people. Get with the program. It is scheduled for delivery Tuesday. The problem with that is we live so far off the road that our postal carrier will not bring packages to our doorstep. She leaves a card in the mailbox and then we have to go to the post office to get the package. The post office closes at 4:00 and we don't get back into town from work until nearly 4:30. That means that I won't get my yarn until Friday when DH is off work and can run to the post office for me. Aaaaaaaggggghhhh.
Okay, I feel better now.
Go Colts!

Labels: ,

Monday, January 15, 2007

Cuteness and An FO


First up is the Cuteness. Emma and C.C. all sacked out for the night. We got this soft side snugle house for them a couple of years ago at wally world. They liked it so well that we went back to get a second one so they could each have their own. There were none left so they have to share the one. I really don't think they mind sharing though. These two get along great. When it gets really cold I put one of the kitty pies inside for extra warmth. But, thanks to global warming I haven't had to do that this winter.


In the Finished Object catagory the Swallow Tail is blocked and ready to show off. Even though this is a pretty simple lace pattern I had a heck of a time finishing it. The main problem was trying to watch too much tv while also trying to keep track of charts. I would knit a few rows and rip back a few rows. Knit a few more, rip back a few. I probably could have left a couple of the mistakes in and no one would have ever noticed. But, I would know they were there and it would drive me insane. Then there was the whole running out of yarn problem. I ended up having to order another skein and finally finished it. I learned a lot about lace construction while working on this project. I also discovered I enjoy knitting lace. A year ago I couldn't imagine that I would ever have any desire to knit lace. Now I find myself surfing the web for other lace projects to tackle. The next one will probably be a rectangular stole. Something very wispy and elegant.

Project Specs can be found here.

Labels: , , ,